Information about the object

“Multi-storey housing estate “Vremena Goda”, Petra Metalnikova Street, Krasnodar, Letters “Zima”, “Vesna”, “Leto””

Customer

ООО «ГИК»

Objectives:

  • enhancement of strength and deformation characteristics of EGE-2,3,4,5 soils at the base of the foundation;
  • balancing of physical and mechanical characteristics of soils at the base of foundations;
  • prevention of settlement of foundations and basements above allowable level by compaction of EGE-2,3,4,5 soils at the base of the foundation.

Solution:

Compaction of EGE-2, 3, 4, 5 soils by the method of pressure injection cementation. Considering the local engineering-geological conditions of the construction site, the foundation soils were reinforced according to the following construction procedure: solid reinforcement with injectors to the given depth with one layer of injectors.

Year of performance: March-April 2014, August-September 2014

Return to the list of objects
TelephonesCall for competent consultation